Redring CD-RW901SL User Manual

Browse online or download User Manual for Coffee makers Redring CD-RW901SL. Redring CD-RW901SL User's Manual

  • Download
  • Add to my manuals
  • Print
  • Page
    / 12
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 0
THE
IMPORTANT: READ AND SAVE THESE INSTRUCTIONS FOR THE BENEFIT OF THE USER
BOILING WATER DISPENSER
INSTALLATION & OPERATING
INSTRUCTIONS
Page view 0
1 2 3 4 5 6 ... 11 12

Summary of Contents

Page 1 - BOILING WATER DISPENSER

THEIMPORTANT: READ AND SAVE THESE INSTRUCTIONS FOR THE BENEFIT OF THE USERBOILING WATER DISPENSERINSTALLATION & OPERATINGINSTRUCTIONS

Page 2 - Important Notes

10SB2heat up timesTable 3Professional Service (see table 2)If the SELF HELP checks do not cover the symptom, you should seek professional help.The fol

Page 3 - Where to locate the SB

11APPLIED ENERGY PRODUCTS AFTER SALES SERVICEWe offer a technical service on the telephone to contractors and other customers seekingadvice.RING 08709

Page 4 - Installing the mains supply

GuaranteeWe, Applied Energy Products Ltd., guarantee that should this SB2unit prove to be defective by reason of faulty workmanship or materialwithin

Page 5

Thank you for choosing a quality Redring product manufactured by Applied Energy Products Limited, Peterborough, U.K.2Contents PageInstallation Instru

Page 6

3What the installer will need● A 13 Amp fused double pole isolating switch with a minimum contact gap of 3mm in each pole.● Suitable length of 1.0mm2t

Page 7 - How to operate the SB

4Installing the mains supplyIf a mains supply is not already available.● Install a 13 Amp fused double pole isolating switch with a minimum contact ga

Page 8 - DESCALING

5Fig. 5bFig. 4Fig. 5a

Page 9 - Trouble shooting

6Fixing the unit on the wall● Use the wall mounting bracket supplied and the two lower fixing holes.● An extra top fixing point is available by tempor

Page 10

7Operating InstructionsGeneral Product DescriptionThe SB2is a wall mounted, self calibrating and self filling boiling water heater. It can be usedfor

Page 11 - SPARE PARTS

Please Note:● The SB2can take several minutes to reach the required temperature, depending on usageand tank capacity.● To avoid energy wastage, the SB

Page 12 - Guarantee

9Trouble shooting SELF HELP (See Table 1) – If the SB2is unsatisfactory, then make the following checks beforecalling out the contractor. Any one of t

Comments to this Manuals

No comments